Some examples of our work

veriso-21
veriso-31
veriso-41

Previous
Next

Guesthouse Chamonix, France

In the construction projects in the high mountains foam glass gravel makes a valuable contribution to energy-efficient construction.

Straßenbau-Norwegen-372x300
IMG_3509_klein
IMG_3480_klein
IMG_3477_klein
IMG_3466_klein

Previous
Next

Road construction, Norway

The SGGC delivered in 2014 about 15,000 m³ foam glass gravel to Norway to build a new road section.

22
81
111
71
31
9

Previous
Next

Production Site at Edewecht

Depending on demand and conditions, different load carrying values can be achieved by applying different compression ratios to max. 2:1 to the ground.

VDOT-I-564
JFK Blvd Philadelphia
S-Capital
Pier-26-NYC
Bayonne-NJ-neu
RCA Pier Camden NJ
USTA Flushing Meadows

Previous
Next

Road construction USA

Foam glass gravel in use as a substructure for streets and buildings.

Due to its excellent suitability as a dry layer, foam glass gravel can be used particularly well in areas with high soil moisture in order to create a stable, load-bearing and possibly insulating base.

Bild9-380x300_c
Bild2-150x1501-372x300

Previous
Next

Heat storage Eggenstein

Application with approx. 1.000 m³ foam glass gravel for heat supply of a school.

2
16 (1)
1
3
4
5
7
8

Previous
Next

IKEA Hamburg

Especially on a parking deck with highly dynamic conditions and thousands of load alternations foam glass gravel proves its ideal use as a base layer for such applications. Down to come the easy handling and savings due to shorter time for completion

Due to its light weight, applications of foam glass gravel in upper levels are possible

High compressive strength at low weight are the key parameters for these types of applications.

IMG_14141-372x300
IMG_14221-e1442771316532

Previous
Next

Family house with office wing, Markt Nordheim, Germany

Owner and planner have agreed to use foam glass gravel, because this material shows, in addition to a good thermal insulation, frost resistance and capillary breaking 50% lower cost for applying the foundation and thus shorter total construction time.